(KZN.RU,
February 27, Anton Nozdrin). The laboratory quality control of drinking water,
supplied to the city, is strengthened in Kazan. Almir Kurbanov, the deputy
chairman of the Housing Committee, reported to Ilsur Metshin, the Mayor of
Kazan, about the readiness of municipal utilities to the spring flood on the
Business Monday.
The deputy
chairman of the Housing Committee said that the management companies and
housing organizations have prepared the required number of pump-out equipment,
“sleeves” for pumping, sandbags and gravel traps, and the necessary supply of
inputs and fuel is created.
Experts of
the MUE “Vodokanal” ensure constant availability of water intakes, water
treatment plants, pumping stations to work during the flood. The results of the
diving survey of underwater parts of hydraulic structures and culverts have
confirmed their readiness for the flood. A. Kurbanov reported that the list of
88 apartment buildings, which are home to about 14 thousand people, was
compiled on the basis of inspection of potentially dangerous areas of possible
flooding. “The Management Company was instructed to continue snow removal from
the places of possible flooding, to ensure passage of melt water and pumping it
to the adjoining areas in available sewers”, said the deputy chairman of the
committee.
A. Kurbanov
said that the organizations, responsible for cleaning yards, are prohibited
from opening sewers for dumping meltwater without permission. This is
important, for example, for the part of the city, which is beyond the river,
taking into account the overload of the SPS “Verhnyaya”. “All measures have
been taken for the unimpeded access of residents in houses, and special ladders
will be installed in areas of flooding if necessary”, said the speaker.
I. Metshin
approved the plan of anti-flood measures and instructed to closely monitor the
implementation of all its services.