(KZN.RU,
January 19, Alsu Safina). The 45.5 km of storm sewer networks have been cleaned
and the throughput restored in 2016 in Kazan. In total, the cleaning more than
215 km of networks is made since 2012, which is 56% of the total length of the
storm water drain on the balance of the Committee on improvements. Igor
Kulyazhev, the chairman of the committee and the deputy head of the Executive
Committee, said this today in his report to Ilsur Metshin, the Mayor of Kazan,
on the results of the previous year. 290 million rubles were allocated from the
republican budget for these purposes.
Igor
Kulyazhev reported that the measures to eliminate the failure in the networks
of storm sewer on street Zorge were carried out in full, which were damaged
during work on the construction of the underground. Also repair works on storm
water networks in a ravine on the street Latyshskih Strelkov, begun in 2015,
were completed in February last year.
The head of
the Committee also drew attention to the fact that the state of emergency
reservoirs has been identified during the reconstruction of the park “Chernoe
Ozero”. Because of this, the nearby streets and the territory of the park were
regularly flooded during heavy rainfall. Rerun of collectors damaged sections
with a total length of 398 m was carried out to solve the problem at the
expense of extra-budgetary funds.
In the
report, the Chairman of the Committee said that the allocation of land is made
for the construction of sewage treatment plants in the production of storm
sewer near the Kazan State Academy of Veterinary Medicine named after N. Bauman
and project documentation for their construction is developed.
Total
length of urban networks storm water drain was 380 km for the year, 9 km of
them were taken on the balance sheet in 2016. According to Igor Kulyazhev, work
on restoring of the storm water drain capacity of the city will continue this
year.