(Kazan City
KZN.RU, April 6, Zilya Ghali). In Kazan work on the program of overhaul of the
housing stock is in full swing. One of the houses, located at st. Dekabristov
in the Moskovsky area, was visited today by the Mayor of Kazan Ilsur Metshin.
The Mayor praised the quality of the work and talked with residents of the
house, where the roof and communication has been completely renovated and
workers began to repair the facade and entrances.
Residential
house №154 at st. Dekabristov, built in 1964, was included in the program of overhaul
in 2016. However, the repair work was carried out here in the past at the
expense of maintenance. So, in 2006, roofing of the house was partially
renovated, in 2010 downspouts of central heating and cold water were replaced, and
in 2013 the first and second entrances were renovated.
As part of
the overhaul of the program this spring several types of work worth a total of above
17 million rubles are scheduled in the house. The list of works includes the
replacement of the central heating, cold water supply, sewerage and electricity,
repair of the basement, the roof (with insulation of attic floors), facade and
entrances. To improve home energy efficiency capacity unit for weather control
is planned to be installed.
If outside
the house repair work is in full swing, the apartments have been already completed:
new radiators were installed and all the pipes were replaced. Ilsur Metshin
asked the eldest at home Tatiana Orlova, whether residents had any inconvenience
during the repair.
Refurbished
house transformed considerably, not only internally but also externally. The
contractor proposed a creative solution for the decoration of the facade, which
was unanimously supported at the meeting by the inhabitants of the house.
"Every year we try to do something new, this year we came up with an
unusual color scheme for this house. The facade will have great images of
trees, the trunks will serve as downspouts and entrances will appear as inputs
in the grotto,"- the director of "Progress" Andrei Zakamskiy said,
adding that contractor decided to support the campaign "Blooming Kazan"
with the unusual design and landscaping.
In general,
to date, the repair of the house is made by 65%. According to the director of LLC
"MK “Utilities of Moskovsky district of Kazan" Oleg Kalimov, the roof,
plumbing, heating and sanitation, electricity were completely replaced. Work to
streamline of low-voltage systems, repair of porches are on go, the workers
begin to repair the facade. It is also planned to equip the surrounding area – bicycle
parking, wooden benches and urns, planting shrubs are provided. All work will
be completed in June.
Ilsur
Metshin drew attention to the quality and timing of the operations. "The
quality of work on the program of overhaul of the housing stock is growing
every year. Most importantly - we are in constant dialogue with the residents,
the residents are actively involved in decision-making. I wish that your
battery was always warm, and the light was always in the apartments,"- the
Mayor said to the residents, encouraging them to take care of the house and of
the future green spaces.
The
workshop was attended by the head of administration of the sky and Moskovsky districts
Damir Fattakhov, chairman of the Housing and Utilities of Executive Committee
Iskander Giniyatullin, director of the MUE "Technical supervision service
for the implementation of municipal programs on the content of housing and
communal services and land improvement" Asiya Gudz.