(KZN.RU,
May 31). Rustam Minnikhanov, the President of the RT, instructed to pay special
attention to the preparations for the new heating season. The head of the
republic noted that close attention should be paid to security issues,
including preparation for the heating season of industrial facilities. The
results of the work of the fuel and energy complex organizations and housing
and communal services during the heating period of 2018/2019 have been
discussed today at a meeting of the Cabinet of Ministers of the RT.
Opening the
meeting, Alexey Pesoshin, the Prime Minister of the RT, said: “The passage of
the autumn-winter period in normal operation in recent years shows that the
leaders of both municipal districts, enterprises, and organizations take
responsibility for the preparation of thermal power plants, boilers, and the
entire housing and communal sector complex”. According to the Prime Minister of
the RT, thanks to the coordinated work, the preparation for the autumn-winter period
of 2018/2019 has been completed on time.
Alexey
Pesoshin also demanded that the heads of municipalities take maximum efforts to
eliminate the flaws of the past heating season and timely receive passports of
readiness for the new one. The fuel and energy and housing and communal
complexes ensured the stable operation of life support systems.
Irek
Faizullin, the minister of Construction, Architecture and Housing and Communal
Services of the RT, made a keynote address at the meeting. He reported in detail
about the heating period of 2018/2019 and the tasks that need to be addressed
in preparation for the heating period of 2019/2020.
In general,
municipalities promptly launched heat at housing and social facilities.
According to the municipal districts, the heat was launched in 16522 apartment
buildings (100%), at 7913 socio-cultural facilities (100%) from the beginning
of the heating period from September 21 to October 5, 2018.
The
Minister noted that the heating period passed without major accidents. However,
there were temporary outages, but residents always had the heating.
Irek
Faizullin reported that there are 13697 gasified multi-apartment residential
buildings in the republic, which is 80.3% of the total number located in the
RT.
Boris
Petrov, the head of the Privolzhsky department of the Federal Service for
Environmental, Technological and Nuclear Supervision, Rausil Khaziev, the
general director of the OAO “Tatenergo”, Ilshat Fardiev, the general director
of the OAO “Setevaya Kompaniya”, Denis Kalinkin, the head of the Kazan
Executive Committee, Sergey Krainov, the head of the State Housing Inspectorate
Of the RT, also spoke at the meeting reports the press service of the President
of the RT.
Rustam
Minnikhanov, the President of the RT, ordered to pay special attention to the
preparations for the new heating season. “The state of the energy sector, the
housing stock, the gas supply systems, the work of all these services must
comply with the standards”, said Rustam Minnikhanov. “Look at how many cases of
carbon monoxide poisoning have occurred! We must give a serious assessment,
indicate where we have weaknesses”.
Summing up
today's meeting, Rustam Minnikhanov said that all the proposals should be
worked out. According to him, the main task is to have readiness passports for
all objects by September 15. “We need to carefully consider all available
training programs for the heating season”, he said.