(KZN.RU,
January 20). The first apartment building with solar panels will appear in Kazan.
Timur Alibaev, the head of the Aviastroitelny and the Novo-Savinovsky districts
administration, told this to Ilsur Metshin, the Mayor of Kazan, summing up the
2016 year.
He noted
that the solar panels will be installed on the roof of a 9-storey residential
building “Red Apple”, which is being built at the intersection of Lukin and
Academician Pavlov streets in the Aviastroitelny district. The generated
electricity will be used for lighting public spaces. Construction of the house
began last year.
Speaking of
housing, Timur Alibaev reported that 106.6 thousand square meters of housing
(1510 apartments) were entered in the Aviastroitelny and the Novo-Savinovsky
districts of Kazan in 2016. 6 houses of 42.8 thousand square meters,
multi-level parking for 349 places and a kindergarten for 140 places was
entered by the company “YIT Kazan”. At the end of the year the Executive Committee
gave permission for commissioning of the house on the 437 apartments of the
residential complex “Stolichny” first stage in the 70 quarter. According to the
project, the complex includes three houses on 1.4 thousands of apartments, with
underground parking and a kindergarten for 150 places.
This year
it is planned to put into operation 12 apartment buildings with total area of
195.1 thousand square meters: 3 houses of 51.3 thousand square meters in the
Aviastroitelny district and 9 houses of 144.3 thousand square meters in the
Novo-Savinovsky district.
In 2017,
the construction of one of two 10-storey buildings in the residential complex
“Vzletnaya Polosa” (streets Lukin/Godovikov) will be completed. The OOO
“Yashma” plans to complete the construction of 17-storey residential building
of 12 thousand square meters on the Hakim Street. This construction was made
possible thanks to the fact that the investor resettled 13 individual houses.
Another
investor OOO “Sarmai” now settles three emergency houses. In general, as the
head of the district administration explained in his speech, the problem of
emergency houses is shifted from the dead point. Residents of two other
emergency houses settled in a newly built house on Malaya Krylovka and in
apartments, released during the inventory of the municipal housing stock. 10
houses are excluded from the list of emergency: there are major repairs to be
made. 11-storey house of 120 apartments on the street Maksimov, 37b will be put
into operation in November, in which it is planned to resettle the inhabitants
of the houses №37 and 39 on the Maksimov street.
In
addition, 6 houses are included in the municipal program for the resettlement
of residents of emergency houses: in the village Krutushka (street
.Tsentralnaya, 28, 30, 31, 40) and houses at the streets Pobezhimova, 34 and
Novo-Karavaevskaya, 2.